Friday, January 04, 2008

SDLC

Agile. Waterfall. CMM. Spiral. Test Driven. Blah, blah, blah. I believe I have researched a dozen software development methodology and have tried many of them in practice. Unfortunately I have yet to find one that works. One that combines rapid development with high quality and delivers projects within their targeted timeframes.

I suppose if it was easy, then there wouldn't be entire shelves at Barnes and Noble devoted to it. It it was easy, then everyone would deliver with great success. I'm becoming convinced that no single methodology is portable through development shops. And that successful SDLC (System Development Life Cycle) is a painful trial-and-error process that adopts aspects of several disciplines.

I've tried the standard waterfall. It generally has two problems. First, it is nearly impossible to completely define all the functions of a system prior to providing any code. And second it is very difficult to prevent scope creep.

In the first case, a business analyst has to be imaginative enough to define all aspects of the system. Then she must be able to accurately write these into requirements that are understandable by developers. I've never seen this done well. When overdone, the volumes of requirements become impossible of shift through, when underdone entire aspects of logic are left undocumented.

Waterfall project tend to be very long, running months or even years. This causes the inevitable panic when business analysts realize a pet feature is not included. The panic often results in scope creep, which in turn causes the project to run longer.

We've tried incremental methodologies, such as Agile too. Ok, you say, Agile isn't a methodology, but a class of methodologies. But does anyone really implement strict Extreme or Scrum or EVO?

Regardless, Agile methods have their built-in weakness too. For instance, how do you know when you are done? Or, as in the case with my current projects, resources get diverted into new critical projects, leaving others unfinished.

When it's all said and done, some hybrid method seems to work best. Concrete, but overlapping, phases are necessary for project management. Within each phase, iterative cycles with feedback have great benefit. Who knows, maybe I'll develop my own methodology, and then write a book (that no one will read).

Friday, February 09, 2007

Implementing Agile Development

Sometime late last year I was introduced to the concept of Agile Development. Actually, I had been formulating iterative techniques over the past 10 years. Craig Larman's book simply reinforced my thinking. That is, software is best developed in manageable increments.

The bigger problem is moving a team steeped in serial waterfall methods to interative methods. Some people simply don't get it; they don't get collaboration; they don't get accepting change; and they don't get emphasizing software over documentation. All of which is surprising because most development teams never receive adequate documentation, constantly deal with change, and usually brain storm to solve problems.

For us de-emphasizing documentation shouldn't be so bad, after all, we don't receive good requirements anyway. But strangely enough, there are developers who still believe that one big master documents is necessary for successful projects. These people are wrong. It is wasteful and expensive to attempt to write a complete specification prior to engineering the software.

I saw this first hand a DoubleClick, Inc several years back. The firm hired a team (larger than my current department) dedicated to writing specs. The documents produced by this group were huge, numbering hundreds of pages. And the details were debated ad-nausium, leading to stagnation. What was produced was documents, what wasn't produced was working software.

A greater problem for us is managing multiple projects. Our technologies are not constructed on a common code base. Therefore each project becomes its' own set of increments. Currently we have five projects under development. That's a lot of work for a staff of seven plus four consultants. With all these concurrent projects, managing increments becomes difficult. Afterall, it isn't practical to deliver an increment every week. Or is it?

We seem to do alright with collaboration, but there is room for improvement. It helped to implement daily stand-up, or scrum, meeting. The meetings are short and focus on the goals for the day. We have not attempted to implement strict pair programming, althought there is very frequent teaming on tasks.

I remain a strong proponent of agile and iterative development. Over the next couple of months we will be able to take an objective look at the results of these methods.